The way almost every seller plans an import is forwards: “I place the order in September, the supplier takes a month, the ship takes another month, customs takes a few days, and by November I am selling.” That arithmetic works from March to August. In the fourth quarter it breaks, and it breaks in a particular way: no single link fails, several stretch at once and all of them in the same direction.

The underlying reason is that everybody wants to move cargo in the same three months. Importers pull purchases forward to hit the sales peak, factories have a queue, vessel space sells out earlier, ports receive more containers than they comfortably process, and marketplace fulfillment centers receive more pallets than they can make sellable in a day.

Planning forwards in that context means adding up optimistic averages and discovering the error when there is nothing left to do about it. The alternative is to plan backwards: fix the day the product has to be selling first, and subtract each link until you reach the date you must place the order. If that date has already passed, at least you know early enough to pick another route.

One warning before starting, and it is the most important line in this piece: I am not going to give you transit times, freight rates or customs windows, because they vary far too much by lane, by carrier, by season, by commodity and by the customs broker handling your file. Any number circulating as “standard” is, at best, somebody else’s average. What can be done is explain what each link is made of, what moves it, and how to measure your own.

iqseller panel on importing on Q4 timelines
Illustrative view of the module in iqseller.

what makes the year-end calendar different

Three things change, and it is worth separating them, because each is managed differently.

Freight demand concentrates. The shipping peak happens before the sales peak, for an obvious reason: goods have to arrive before they can be sold. That means the moment of greatest pressure on transport is not November, it is August, September and October. Several operator guides place ocean freight peak season on the major lanes between August and October.

Local calendars cut the window. In 2026 China’s Golden Week ran from 1 to 7 October, with most operations resuming on the 8th according to advisories from operators such as DACHSER, and the Mid-Autumn Festival fell separately from 25 to 27 September, compressing the calendar further. Several forwarder guides warn that real disruption starts in the weeks before 1 October and continues one or two weeks past the 7th while the backlog clears. Looking at the next cycle, Chinese New Year 2027 falls on Saturday 6 February, with the official holiday reported around the 5th to the 12th, and factories tend to wind down from mid-January without reaching full output until late February or early March.

The cost of being wrong rises. A two-week delay in April gets absorbed. The same delay in November takes you out of the peak, and goods that land late are no longer worth the same: they sell afterwards at post-season prices, and in the meantime they pay storage during the part of the year when storage is most expensive. Amazon publishes higher monthly storage rates for October to December in several marketplaces; in its own 2024 fee-change documentation for the United States, standard-size storage moves from 0.78 to 2.40 dollars per cubic foot between the two periods. Mexican rates have to be read in your own Seller Central, because they change by category and by year.

It is worth walking the chain and naming what tightens at each point. Not to memorize it, but to know who to ask and what to ask them.

  • The factory queue. Your order waits behind others. What moves here is not production time but waiting time before production, and it depends on your relative size as a customer.
  • The supplier’s inputs. They buy too. A material that normally arrives in a week can take three in season, and that delay lands on you in full.
  • The space booking. In peak season space sells earlier and carriers tend to overbook, because some cargo always misses the cutoff. When space tightens, cargo rolls: your container leaves on the next sailing, not the one you booked.
  • Lane capacity. Carriers adjust capacity by cancelling sailings when it suits them, and operator advisories warn that such measures may appear depending on demand. A cancelled sailing is not a few days: it is a full week, because the next one leaves when it leaves.
  • The arrival port. Here the chain becomes Mexican and has its own history. In 2026 Manzanillo went through documented congestion episodes: a customs staff work stoppage from 12 to 16 May, reports of weeks of stalled operations by July, an emergency plan activated by Ferromex in late July in response to the backlog, and a January that was the busiest month in the port’s history, with more than 354,000 TEU.
  • Customs clearance. It depends on your tariff classification, your documentation, whether you are selected for inspection, and the workload at that customs office that day. It is the link with the most variance in the whole chain and the one nobody can promise.
  • The inland leg. It is not just distance. Maersk, in an August 2026 advisory, estimated that the Manzanillo–Guadalajara run can go from 3.5 to 4 hours under normal conditions to between 6.5 and 8 hours under heavy congestion, and on top of that sits the wait for equipment and for a loading appointment.
  • Your warehouse. Counting, inspection, labelling, kitting. It sounds trivial and in season it is not, because your team is doing five other things.
  • The inbound to the channel. Shipping pallets to FBA or Full and waiting for them to be received, processed and made sellable. While they sit on the receiving dock they are not stock.
Glossary: lead time, the real replenishment window →

the surcharges that show up in Q4

The calendar is not the only thing that changes: price does too, and it is worth knowing why, because the line items stack.

Ocean carriers tend to apply, across the third and fourth quarters, a general rate increase, which is a rise in the lane’s base rate; a peak season surcharge, a separate line item added on top of that rate during high-demand months; and an equipment imbalance charge, which covers the cost of repositioning empty containers toward demand. In 2026, S&P Global reported peak season surcharges being applied from 1 June, roughly a month earlier than usual.

What matters here is not the figure — it changes by lane and by week, and carrier advisories are the only place it lives — but three practical consequences:

  • A freight quote taken in July is useless for budgeting an October shipment. You have to re-quote.
  • The logistics cost of the season lot is higher than the rest of the year, and that changes your per-unit COGS. If you load it with the annual average, your season margin is inflated.
  • Moving early does not only buy date certainty: sometimes it buys rate, because it dodges the window where surcharges run highest.

the date chain, run backwards

Here is the exercise. Take the date the product has to be selling — not arriving at your warehouse, selling — and subtract each link using your own measured figure. If you do not have the measured figure, request it from whoever does and write it down with a date, so next time it is yours.

  1. Target selling day.
  2. Minus the days the channel takes to receive and make goods sellable. Ask in Seller Central or in Meli’s help center, and confirm it against your own recent shipments, because it changes in season.
  3. Minus the days to ship from your warehouse to the fulfillment center.
  4. Minus the days of receiving and prep at your warehouse.
  5. Minus the days of the inland leg, using the congested band, not the normal one.
  6. Minus the days of clearance and port dwell. Ask your customs broker for their typical window and their worst window over the last twelve months.
  7. Minus the ocean transit days for your lane, using the high band.
  8. Minus the days between cargo-ready and actual departure, assuming at least one rolled sailing in season.
  9. Minus the production days your supplier confirms in writing.
  10. Minus the queue days before your order enters production.
  11. Minus the days of order confirmation, samples and approval if the product is new.

The result is your cutoff date. And the rule that makes this exercise worth doing: use the high band of each link, not the average. If you add eleven averages, you are modelling a scenario that almost never happens, because the odds of all eleven links hitting their average simultaneously are tiny. If you add the high bands, you get a conservative window you can actually meet.

A useful shortcut when you lack data on every link: build the chain with the averages you do know and add an explicit buffer, decided by you and written into the plan. A buffer you chose is manageable; a delay that surprised you is not.

arriving late against moving early: the full arithmetic

The practical question is usually: do I pay for air freight to arrive on time, or accept the delay? The answer depends on concrete numbers, and it is rarely the one intuition suggests.

An invented example, with the arithmetic checked. You have 1,500 units ready at the factory. Ocean freight door to door comes to 38 pesos per unit: 57,000 pesos, and under that plan goods land 18 days after the peak starts. Air freight comes to 146 pesos per unit: 219,000 pesos, and it lands on time. The freight difference is 162,000 pesos.

On the other side, the cost of the delay. At 28 units a day during the peak, 18 days are 504 units you do not sell in the good window. With a contribution margin of 210 pesos per unit at peak, that is 105,840 pesos of margin that does not arrive in those days.

But those 504 units do not vanish: they land and sell later, at post-season prices. If their contribution margin were 150 pesos, you recover 504 × 150 = 75,600 pesos. The net loss from the delay, in this scenario, is 105,840 − 75,600 = 30,240 pesos.

Conclusion from the example: paying 162,000 pesos in air freight to avoid a 30,240-peso loss makes no sense. Ocean wins by a wide margin.

Now flip one assumption. If those 504 units do not sell later — because the product is seasonal and its demand collapses in January — the loss goes from 30,240 to 105,840 pesos, plus four months of storage in the expensive window, plus capital parked until next season. In that scenario air freight starts to make sense, or at least partial air freight: bring the portion that covers the peak by air and the rest by sea.

That is the method. Not “air yes or no”, but how much of this lot justifies air, with peak margin, post-season margin and the product’s seasonality in the arithmetic.

Glossary: 3PL, the logistics operator that stores and ships for you →

the plan B you build before, not during

Some decisions only work if you made them ahead of time. These are worth defining before the season starts:

  • Split the shipment. One ocean lot covering the base and a smaller air lot covering the start of the peak. It is more expensive per unit than pure ocean and far cheaper than moving everything by air once you are already late.
  • A second way in. Another port, another operator, another inland combination. If all your volume enters through one path, a disruption there hits you as if it were your supplier.
  • An overflow warehouse. A 3PL that can receive the excess when the channel limits your inbound, or when the marketplace’s storage rate does not justify holding a slow-moving SKU there.
  • Your own cutoff dates, more conservative than the supplier’s. If your supplier says their cutoff is the 15th, yours is the 5th. The buffer is yours, not theirs.
  • Documentation ready before loading. A good share of customs delays are not customs: they are incomplete documents, questionable classification, or figures that do not match. That gets solved beforehand, with your broker.

how this reads in iqseller

It is worth being clear about scope: the panel does not manage shipments, does not quote freight and does not know where your container is. It is not an international logistics system.

What it does do is hold the two ends of the chain, which are the ends that determine whether the decision was any good.

At the front end, Forecast gives you sales velocity per SKU and per channel and the days of inventory left at that velocity. That is where step one’s target date comes from: not an invented date, but the day your coverage runs dry.

Inventory shows stock split across FBA, Full, your warehouse and your 3PL, and shows what is in transit with its availability date. That column lets you review the plan without digging through the forwarder’s emails: how many units are coming and when they become sellable.

At the back end, Profitability is where you verify whether the freight decision was right. Net margin per SKU is calculated with the COGS you load, the commissions from Amazon’s settlement and from MercadoLibre orders, FBA and Full fees, shipping, advertising, and the VAT and withholding breakdown. If you load the real logistics cost of the season lot — freight with surcharges included, not the annual average — that lot’s margin appears as it is. If you do not, it appears inflated and you will repeat the decision.

The Parent → Model → SKU tree helps with the partial-air decision, because you almost never need to pull an entire model forward: you need to pull two or three SKUs. And Alerts fires when coverage crosses the threshold you set, which is the moment options other than urgent freight still exist.

what to confirm, and with whom

To close, the part no panel and no guide can take off your hands:

  • Closure and full-production restart dates, in writing, with each supplier.
  • Booking cutoff and rolling policy, with your forwarder or carrier.
  • Typical and worst clearance window over the last twelve months, with your customs broker.
  • Current receiving times and seasonal inbound limits, in Seller Central and in MercadoLibre’s help center, because they change and are worth reading at the source.
  • Current October to December storage rates, in your own account.
  • Your 3PL’s capacity to take overflow in November, agreed in September.

The Q4 calendar is not negotiable, but it can be planned. And planning it backwards, with the high band of every link and a cutoff date of your own, is the difference between deciding in September with options and deciding in November with one.

See every metric in detail →

start earning more from what you already sell

start your free trial, 14 days
hola@iqseller.app

J del Monte 39, Piso 2, Int 2B, Huixquilucan, Estado de México, 52764, México