It is 22 November. Buen Fin is over — in 2026 it ran from Friday the 13th to Tuesday the 17th, five days, with Monday the 16th a public holiday in Mexico — and five weeks of the strongest season of the year are still ahead. The logical move, the one almost everyone makes, is to focus on getting December right and leave the January purchase for when the numbers are in.

That is exactly the trap. By the time you have December’s numbers it will be January, and the goods you order that day will land in February or March. The order that covers January cannot be decided in January. It has to be decided now, with incomplete information, because the replenishment calendar runs ahead of the sales calendar.

And there is a calendar complication. If part of your catalog comes from Asia, Chinese New Year 2027 falls on Saturday 6 February, with the official holiday reported around the 5th to the 12th, and forwarder guides agree that factories wind down from mid-January and many do not return to full output until late February or early March. If your order did not enter production before that dip, your February and March replenishment becomes an April replenishment.

None of this is an argument for guessing. It is an argument for deciding with the partial signal you actually have, and for structuring the purchase so part of it can be corrected once the real number arrives. What follows is the method. The arithmetic examples are invented and labelled as such.

iqseller panel on planning January replenishment
Illustrative view of the module in iqseller.

the calendar arithmetic, run backwards

Before projecting anything, count the days you have. The arithmetic runs in reverse: from the date you need the product selling, subtracting each link.

Say you want new sellable inventory on 15 January, because that is when your season coverage runs dry. From there backwards, with windows you have to measure and confirm, not mine:

  • Days for the channel to receive the goods and make them sellable.
  • Days to ship from your warehouse to the fulfillment center.
  • Days of receiving, counting, labelling and prep at your warehouse.
  • Days of the domestic leg from the port or from the supplier.
  • Days of customs clearance and port dwell, if you import.
  • Days of international transit.
  • Days from cargo-ready to actual departure, accounting for rolling in peak season.
  • Days of production.
  • Days of queue before your order enters production.
  • Days of order confirmation.

Add those links with your own measured figures and you will discover one of two things. Either the cutoff date for your January order has already passed, or it is days away. In both cases, waiting for the December close is not the conservative choice: it is a decision not to restock.

The domestic version of this chain is shorter but not immune. A Mexican supplier who normally delivers in two weeks also has a December queue, also closes for holidays, and also runs slow through the first week of January.

what you know today and what you do not

On 22 November you are not blind. You are working with partial information, which is a different thing.

What you already know with reasonable confidence:

  • Sales velocity per SKU during the peak. Not a projection: what actually moved during Buen Fin and the days after.
  • Which SKUs responded and which did not. The season is the best laboratory of the year. A product that did not move with a discount and maximum traffic will not move in February either.
  • Current inventory per channel and its coverage at the new velocity, not at the annual average.
  • What is already in transit and the date those units become sellable.
  • Your burn rate: which SKUs will not reach 31 December with current coverage.

What you do not know:

  • How much December will weigh against Buen Fin this particular year.
  • Whether demand was pulled forward into Buen Fin or December will repeat it.
  • How much inventory will be left on 1 January.
  • How far demand will fall in January and how long it will take to normalize.

The difference between a seller who plans and one who improvises is not that the first one has December’s data. It is that the first one knows which ratios from their own history turn what they already know into a defensible projection.

Glossary: forecast, projecting demand from your own data →

projecting December from the Buen Fin signal

The method needs no complicated model. It needs two ratios that come out of your own history and that differ by product family.

The first is Buen Fin’s weight inside the season: what share of November plus December units sold during the Buen Fin days in previous years. The second is January’s weight against December: what share of December units repeats in January.

An invented example, with the arithmetic checked. Take a product family that sold 2,400 units across the five Buen Fin days. Your history from the two previous years says that, in that family, the Buen Fin days accounted for roughly 18% of total November plus December units.

Season projection: 2,400 ÷ 0.18 = 13,333 units for November and December combined. If you already sold 3,900 units from 1 to 22 November including Buen Fin, you have about 9,433 units left to sell from 23 November to 31 December. Split November from December with your own seasonality and say December carries around 7,100 of those units. Now you have the base for the next step.

On to January. Your history says January units in that family run at about 42% of December’s. 7,100 × 0.42 = 2,982 units, call it 3,000, which is roughly 97 units a day.

Two warnings about this exercise. First, the ratios are yours: there is no industry percentage you can copy, and if someone hands you one, ask which market and which category it came from. Second, a ratio built on two years of history is fragile. Use it, but leave room to be wrong, which is exactly what the next section is about.

splitting the purchase into three tranches

Here is the part that resolves the tension between deciding early and not being expensively wrong. The January purchase does not have to be one decision. It can be three.

The firm tranche. The quantity you will almost certainly need, on SKUs that already proved demand during the peak. It gets ordered now, paid for as usual, and sent into production before the queue fills. In the example, if you are reasonably sure January will not fall below 70% of your projection, the firm tranche is about 2,100 units.

The conditional tranche. Additional quantity the supplier holds in their queue but that you confirm on an agreed date — say 20 December, when you have three quarters of the month measured. This is negotiated: it means reserving capacity without locking quantity, and a supplier you have worked with for years will usually accept it, especially if you arrive with your projection in writing. In the example, about 700 units.

The reaction tranche. The one you leave open to correct in the first week of January, with the full number in hand. It will arrive too late for January, but it covers February and March, which is precisely the stretch where Chinese New Year can leave you without replenishment. In the example, 200 units plus whatever December’s data indicates.

Splitting it this way has two advantages: it reduces the risk of overbuying against a fragile projection, and it secures a place in the production queue before that queue closes. What does not work is the opposite, and it is the most common pattern: order nothing in November and order everything in January, when the supplier is either closed or saturated.

One cash note, which for many sellers is the real constraint: December is the month when the most money comes in and also the month when the most money is parked in inventory. Committing the firm tranche in November means deciding with November’s cash, not December’s. Run that arithmetic before you sign.

what it costs to wait for the data

Now the other side, same invented example. Say the seller decides to wait and orders on 8 January, with December closed and the exact figure in hand.

Their measured lead time in that window, including the start-of-year production queue and the inbound to the channel, is 45 days. The goods become sellable on 22 February. Between 15 January — when coverage ran out — and 22 February there are 38 days.

At 97 units a day that is 3,686 units not sold. With a contribution margin of 165 pesos per unit, that is 608,190 pesos of margin that never arrived. And December’s exact number, the prize for waiting, was used to order the right quantity of a product they did not have for five and a half weeks.

Worse: that 8 January order lands right in the window where Asian factories begin to wind down. If it misses production before the closure, the February date becomes a late-March date, and the gap goes from 38 days to more than 70.

The honest comparison is not “order early and be wrong” against “order late and be right.” It is being wrong about quantity against having no product. A quantity error gets corrected with price, with advertising, or with the next order. A five-week hole in your main SKU does not get corrected.

January is not December, and the difference matters

There is an error symmetric to not buying, and it is expensive too: projecting January with December’s velocity.

January has its own shape, and it is worth holding in mind before committing quantities:

  • Demand falls against December in most categories, but not equally in all of them: what gets gifted in December behaves differently from what gets bought for personal use.
  • The first days of January are shaped by the post-holiday cash squeeze and by Día de Reyes on the 6th, which moves some categories and leaves others flat.
  • The season’s return rate concentrates in January, and units that come back in good condition re-enter your available stock. If you do not count them, you overbuy.
  • Average prices drop: the market is coming off a month of discounts and raising price too fast costs conversion.
  • Leftover December inventory is not healthy inventory by default. What did not sell at maximum discount probably needs a different lever, not more units.

The right way to use all of this is simple: project January with your own historical January-to-December ratio, by family, and subtract what you expect back in returns. That subtraction is what prevents the overbuy that then spends four months paying storage.

Glossary: days of inventory, your countdown →

how this reads in iqseller

In the panel, this decision stops depending on building a spreadsheet during the busiest week of the year.

Forecast holds half the calculation: sales velocity per SKU and per channel recalculated with what you just sold at peak, the days of inventory left at that velocity, and projected coverage against the date you expect replenishment. That is where you see, without manual arithmetic, which SKUs will not reach 31 December.

Inventory supplies the other half: stock split across FBA, Full, your warehouse and your 3PL, what is in transit with its availability date, and inventory valuation, which turns “I have product left over” into a number of pesos sitting still. That figure is what makes the firm tranche a real discussion, because it tells you how much cash you are talking about.

Profitability keeps you from buying the wrong thing: net margin per SKU, with the COGS you load, the commissions from Amazon’s settlement and from MercadoLibre orders, FBA and Full fees, shipping, advertising, and the VAT and withholding breakdown. A SKU that sold heavily during Buen Fin on negative margin does not deserve a firm tranche, and that only shows up with everything deducted.

The Parent → Model → SKU tree avoids the classic error of buying by model when the problem is two sizes, and Alerts fires when a SKU’s coverage crosses the threshold you set.

What the panel does not do: it does not decide your purchase, it does not negotiate tranches with your supplier, and it does not know your factory’s closure dates. Those you have to request in writing. What it does do is put the four numbers behind the decision — velocity, coverage, in transit and margin — in one view on 22 November instead of across five tabs.

this week’s checklist

  1. Pull sales velocity for your top twenty SKUs from the peak data, not from the annual average.
  2. Work out which of them will not reach 31 December with current coverage plus what is in transit.
  3. Derive your two historical ratios by family: Buen Fin’s weight inside the season and January’s weight against December.
  4. Project January and subtract the returns you expect from the season.
  5. Request, in writing, each supplier’s cutoff date, closure days and full-production restart date.
  6. Split the purchase into firm, conditional and reaction tranches, and send the firm one this week.
  7. Put the conditional tranche review on the calendar for a specific December date, before it slips.

Planning January replenishment in November is not guessing. It is accepting that the purchasing calendar runs ahead of the selling calendar, and organizing the decision so the uncertain part is the correctable part.

See every metric in detail →

start earning more from what you already sell

start your free trial, 14 days
hola@iqseller.app

J del Monte 39, Piso 2, Int 2B, Huixquilucan, Estado de México, 52764, México